Inspection record
Caffe Nero
1047 Commonwealth Av · Boston, MA 02215
2inspections since May 2026
12violations recorded
HE_Passlatest result (city code)
License category: Eating & Drinking
Inspection history
Oct 2, 2026HE_Pass6 violations
*Nonfood Contact Surfaces (C)
Clean/sanitize/disinfect all exposed equipment.counters.tables wares ect... Provide all cleaning documents be re-inspected for approval to re-open.
*Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Ceiling & light fixtures damaged from resulting water leak.Provide all necessary repairs as needed. Power to the dining room lights has been shut down
**(A) Ceasing Operations and Reporting (Pf)
Water has been shut off to the establishment.Provide all necessary repairs
***Discarding or Reconditioning Unsafe Adulterated or Contaminated Food (P)
Multiple food items exposed to water due to ceiling leak were disposed prior to my arrival Denatured on site
**(A)-(P) Person-In-Charge-Duties (Pf)
Broken pipe in the unit above the establishment water damage through the ceiling throughout. Building GM on site along with plumbers to repair pipe Assistant Commissioner Dan Prendergast notified. Voluntary closure issued. PIC Instructed to provide all necessary repairs clean/sanitize/disinfect using a professional licensed restoration company provide all documentation be re-inspected by building electrical & health for approval to re-open.
*Floors Walls and Ceilings-Cleanability (C)
Remove all stagnate water from the affected floors Clean/sanitize/disinfect the location throughout Provide all cleaning documentation to the Health Department.
Sep 20, 2026HE_VolClos6 violations
**(A) Ceasing Operations and Reporting (Pf)
Water has been shut off to the establishment.Provide all necessary repairs
***Discarding or Reconditioning Unsafe Adulterated or Contaminated Food (P)
Multiple food items exposed to water due to ceiling leak were disposed prior to my arrival Denatured on site
**(A)-(P) Person-In-Charge-Duties (Pf)
Broken pipe in the unit above the establishment water damage through the ceiling throughout. Building GM on site along with plumbers to repair pipe Assistant Commissioner Dan Prendergast notified. Voluntary closure issued. PIC Instructed to provide all necessary repairs clean/sanitize/disinfect using a professional licensed restoration company provide all documentation be re-inspected by building electrical & health for approval to re-open.
*Nonfood Contact Surfaces (C)
Clean/sanitize/disinfect all exposed equipment.counters.tables wares ect... Provide all cleaning documents be re-inspected for approval to re-open.
*Floors Walls and Ceilings-Cleanability (C)
Remove all stagnate water from the affected floors Clean/sanitize/disinfect the location throughout Provide all cleaning documentation to the Health Department.
*Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Ceiling & light fixtures damaged from resulting water leak.Provide all necessary repairs as needed. Power to the dining room lights has been shut down
Violation severity marks (*, **, ***) are the city's published violation levels. Result codes are Boston ISD's own codes, shown verbatim - we found no public legend. Methodology